Skip to content
BackNov 29
Hassan A.
Upwork badge

Hassan A.

Material Takeoff | Construction Cost Estimator | Quantity Take off

Here to provide Construction Cost Estimation and Takeoff Services to General Contractors/Sub Contractors, Builders/Adjusters. I'm a seasoned Quantity Surveyor - Construction Estimator and a Material Takeoff Expert having years of experience in generating detailed Takeoffs for General and Sub-Contractors. I will provide you Construction Cost Estimation and Material Takeoffs for Residential as well as Commercial projects. I have extensive experience in Construction takeoff estimation and completed hundreds of construction cost estimation and material takeoff projects of different regions such as the USA, UK, Canada and Australia. You will be getting a detailed Construction Cost Estimate, Quantity Takeoff, and Material take off list for all the CSI divisions. MY SERVICES: Include material takeoff and cost estimate for: Div. 01 — General Conditions Div. 02 — Site Preparation (demolition, erosion control, clearing debris, etc.) Div. 03 — Concrete (footing, foundation, slab, pavements, etc.) Div. 04 — Masonry (CMU blocks, brick veneer, etc.) Div. 05 — Metal (structural metal, reinforcing steel bars, etc.) Div. 06 — All Lumber Work (studs, joists, trusses, rafters , headers, etc.) Div. 07 — Insulations (caulking, batt insulation, rigid insulation, spray foam insulation, blown-in insulation etc.) Div. 07 — Roofing (shingles, standing seam metal, cedar shake, tpo membrane, flat roofs, etc.) Div. 07 — Exterior Finishes (siding, stucco finish, metal paneling, trims, soffits, fascia/frieze boards, etc.) Div. 08 — Openings (doors, windows, storefronts, skylights, louvers, vents, etc.) Div. 09 — Drywalls/Sheetrock (tapping, mud plastering, sealant, drywall screws, etc.) Div. 09 — Finishes (flooring, baseboards, tiling, wall covering, ceiling, crown molding, etc.) Div. 10 — Specialties (bath accessories etc.) Div. 11 — Equipment (washer/dryer, oven, cooking range, refrigerator, etc.) Div. 12 — Furnishings (countertops, islands, vanities, etc.) Div. 6/12 — Millwork (upper/base cabinets, closet/WIC rod and shelving, linen/pantry shelving, etc.) Div. 22 — Plumbing (pipes, fixtures etc.) Div. 23 — HVAC (ducts, diffusers/grilles etc.) Div. 26 — Electrical (power, lighting fixtures etc.) Div. 31 — Earthwork (grading, excavation, backfill etc.) Div. 32 — Exterior Improvements (landscaping, hardscaping, fencing etc.) Why Estimator_Hassan for your project? 1. Completed hundreds of US-based residential as well as commercial projects 2. Accurate Material Takeoff and Reliable Cost Estimate 3. Accuracy 4. Quick turnaround 5. Unlimited revisions 6. I will help you winning more bids by accurate material take off and Construction estimation for any CSI division. Thanks & regards, Engr. Hassan

🇵🇰Sialkot, Pakistan$15/hr5.00 (7)Since Feb 2023
GlobeUpwork

Earnings and projects

MRR
$20

52-day average (58%) + 6-month average (42%)

World#157,781 / 420k
🇵🇰Country#22,932 / 53.0k
Revenue, last 30 days
$50

Last 6 months: $50

World#96,616 / 420k
🇵🇰Country#13,509 / 53.0k
Total earnings
$3.8k
World#282,637 / 420k
🇵🇰Country#33,107 / 53.0k
Per projectas of Nov 5
$201
World#267,898 / 420k
🇵🇰Country#34,361 / 53.0k
Projects, last 6 monthsas of Nov 5
0
World#210,090 / 420k
🇵🇰Country#32,179 / 53.0k
Projects in allas of Nov 5
19

Across 23 contracts

87% fixed13% hourly
World#138,538 / 420k
🇵🇰Country#23,026 / 53.0k

Earnings, last 30 days

$3.8k+$50 earned in the last 30 daysBilled in all, before Upwork's fee · drag across the chart to see what was earned in any stretch
$3,750$3,775$3,800$3,825Oct 30Nov 14Nov 29

The Upwork profile

Profile completeness

125on Upwork's scaleComplete +25
100
top-1k median

Upwork shows them 100%; the 25 points above 100 come from sections past the basics.

Availability
As Needed, open to offers
Hours billed
38
Clients who'd hire again
100%
Contracts
2 active · 17 done
Portfolio
8 projects
Last worked
Sep 15, 2025
Time zone
Islamabad, Karachi · UTC+5
English· FluentUrdu· Native or BilingualID verifiedOpen to contract-to-hire

Upwork last worked out their Job Success Score Nov 4.

Skill rankings: Top 40% in Project Management worldwide

Ranked by MRR among everyone on Upwork with the skill.

  1. #52Time & Cost Estimate106 freelancersTop 49%
  2. #122On-Screen Takeoff240 freelancersTop 51%
  3. #124BIM Quantity Takeoff257 freelancersTop 48%
  4. #171Bill of Materials333 freelancersTop 51%
  5. #186Bill of Quantity390 freelancersTop 48%
  6. #265Quantity Surveying549 freelancersTop 48%
  7. #272Cost Estimate566 freelancersTop 48%
  8. #277Material Take-Off544 freelancersTop 51%